Home » Managerial Accounting (ACCT 522)

Managerial Accounting (ACCT 522)

as instruction withou plarigrasim

COLLEGE OF BUSINESS AND FINANCE
MBA PROGRAMME
First Semester 2023/ 2024
Managerial Accounting (ACCT 522)
Instructor Name: Dr. Rami Abu Wadi
Assessment Type: Homework – Individual
Student Name:
Student ID No.:
Due date: 5/12/2023
Section Number:
Weighting of the Homework: 15% (out of 100)
Instructions to be followed: please read them carefully!
1. The assignment consists of 4 pages including the cover page and 3 questions.
2. Any late submission will result in 5% deduction penalty from the total grade.
Good Luck,
Questions
ILO’s
Maximum points
Q1
Q2
Q3
C1, D3
C2, D3
C3, D3
Total
10
10
10
30
Points Earned
1
Question 1: (10 marks) (C1, D3)
In 2017, Ahmad & Sons, a small environmental-testing firm, performed 12,200 radon tests for
$290 each and 16,400 lead tests for $240 each. Because newer homes are being built with leadfree pipes, lead-testing volume is expected to decrease by 10% next year. However, awareness of
radon-related health hazards is expected to result in a 6% increase in radon-test volume each year
in the near future. Jim Rouse feels that if he lowers his price for lead testing to $230 per test, he
will have to face only a 7% decline in lead-test sales in 2018.
Instructions: (5 marks each)
1. Prepare a 2018 sales budget for Ahmad & Sons assuming that Rouse holds prices at 2017
levels.
2. Prepare a 2018 sales budget for Ahmad & Sons assuming that Rouse lowers the price of a lead
test to $230. Should Rouse lower the price of a lead test in 2018 if the company’s goal is to
maximize sales revenue?
2
Question 2: (10 marks) (C2, D3)
Ahlia Arts is a manufacturer of designer vases. The cost of each vase is the sum of three variable
costs (direct material costs, direct manufacturing labor costs, and manufacturing overhead costs)
and one fixed-cost category (manufacturing overhead costs). Variable manufacturing overhead
cost is allocated to each vase on the basis of budgeted direct manufacturing labor-hours per vase.
For June 2017, each vase is budgeted to take 4 labor-hours. Budgeted variable manufacturing
overhead cost per labor-hour is $14. The budgeted number of vases to be manufactured in June
2017 is 1,100.
Actual variable manufacturing costs in June 2017 were $65,205 for 1,150 vases started and
completed. There were no beginning inventories or ending inventories for the vases. Actual
direct manufacturing labor-hours for June were 4,830.
Instructions:
1. Compute the flexible-budget variance, the spending variance, and the efficiency variance
for variable manufacturing overhead. (7 marks)
2. Comment on the results. (3 marks)
3
Question 3: (10 marks) (C3, D3)
Part A: (4 marks)
Ahlia Computers makes 5,200 units of a circuit board, CB76, at a cost of $280 each. Variable
cost per unit is $190 and fixed cost per unit is $90. Zain Electronics offers to supply 5,200 units
of CB76 for $260. If Ahlia buys from Zain, it will be able to save $10 per unit in fixed costs but
continue to incur the remaining $80 per unit. Should Ahlia accept Zain ’s offer? Explain.
Part B: (6 marks)
Bahrain Manufacturing is deciding whether to keep or replace an old machine. It obtains the
following information:
Old Machine
New Machine
Original cost
$10,700
$9,000
Useful life
10 years
3 years
Current age
7 years
0 years
Remaining useful life
3 years
3 years
Accumulated depreciation
$7,490
Not acquired yet
Book value
$3,210
Not acquired yet
Current disposal value (in cash)
$2,200
Not acquired yet
Terminal disposal value (3 years from now)
$0
$0
Annual cash operating costs
$17,500
$15,500
Bahrain Manufacturing uses straight-line depreciation. Ignore the time value of money and
income taxes. Should Bahrain Manufacturing replace the old machine? Explain.
The End,
4

Place your order
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more

Order your essay today and save 30% with the discount code ESSAYHELP